Checking an electrician's or plumber's bill against agreed points

Check an electrician's or plumber's final bill against agreed points with a room-by-room sheet of quoted, installed and billed points.

Editorial illustration for Checking an electrician's or plumber's bill against agreed points

To check a final bill, count the points agreed on the quote room by room, count what is actually installed at handover, and compare both with the bill. A sheet with room, point type, quoted and actual takes about an hour and catches double billing or missing work while the contractor is still on site.

What is a point, and why does it matter?

In home wiring and plumbing quotes, work is often priced per point: a light point, a fan point, a socket point, a tap point, a drain point. Different contractors define a point differently. One may include the switch and the conduit up to a nearby board, another may not. Ask what a point includes and write the answer in the quote, because that definition decides what you pay for.

How do you set up the sheet?

RoomPoint typeQuotedActual at handoverBilledDifference
Living roomLight4440
Living roomFan2220
KitchenSocket (15A)3341 extra billed
Bathroom 1Tap3330
Bathroom 1Geyser point1011 billed, not installed

The numbers are invented. If quoted points are in column C, billed points in column E and rate per point in column F, the cost of any difference is =(E2-C2)*F2 for that row.

How do you count at handover?

  1. Take the quote and a pencil, and walk room by room.
  2. Test every switch, socket and tap; do not count a point that does not work.
  3. Photograph each wall with the points visible and note the room in the file name.
  4. Mark each as installed, missing or extra.
  5. Note any point moved from the quoted position, since a moved point may have cost more or less.

Do this before you pay the final instalment, not after. A bill queried after you have paid in full is a much harder conversation.

What if the bill has extra points?

Extra work is common; you may have asked for a socket near the bed in the middle of the job. The fair way is to confirm it in writing: a message saying "added one socket in the bedroom, as discussed". Extra points you did not ask for should not be on the bill. If the contractor says you did, ask for the date and place of the request. Stay calm; most disagreements are untidy notes, not dishonesty.

What about materials and labour?

Check whether the quote was labour only or included materials. For materials such as wire, pipes, MCBs and fittings, ask for a list of brands and sizes in the quote and match them against what is on the bill. Keep the packaging or take a photo of the wire drum label where possible, and keep the warranty cards for the fittings that have them.

Where does a tracker help?

SpendixAI can hold each instalment to the electrician or plumber under a custom category, keep the quote and bill photos with the transactions and show you what the job cost in total. The point count itself belongs in a sheet.

What about points the quote did not list?

Some work only shows up when walls are opened: an extra run of pipe, a longer cable, chiselling to hide a line. Ask the contractor to tell you before doing it, with a rough cost, and note it on the sheet as an extra with the date. A line marked extra on the day is far easier to agree than a surprise on the final bill.

Keep the quote, the sheet and photos in a single folder for the house, so a later plumber or electrician can see where pipes and conduits run.

Handover checklist

  • Quote with definitions of each point.
  • Final bill with itemised points.
  • Completed counting sheet and photos.
  • Warranty cards and brand list.
  • Proof of each payment.