A building contractor should track money site by site: running bills raised and received on one side, and materials, labour, sub-contractors, equipment and site overheads on the other. Keep retention and advances separate from income. If every spend carries a site name, you can see which job is earning and which is quietly losing.
Why does a contractor's money feel so uneven?
You pay labour every week and suppliers every few weeks, while the client pays against a running bill, often late and sometimes with an amount held back until the work is accepted. On a good month the sheet shows a margin but the account is empty, because cost left earlier than income arrived. Tracking by site makes that pattern visible before it becomes a cash crunch.
Which categories fit a contracting business?
| Category | What goes in it |
|---|---|
| Materials | Cement, steel, sand, aggregate, bricks, tiles, paint and similar |
| Labour | Weekly or daily wages for masons, helpers, bar benders, carpenters |
| Sub-contractors | Electrical, plumbing, waterproofing, flooring and other trades paid as a package |
| Equipment hire and fuel | Mixer, vibrator, scaffolding, shuttering, diesel for machines |
| Supervision | Site engineer, supervisor, helper's salary |
| Site overheads | Temporary shed, water, electricity, security, safety gear |
| Transport and loading | Tempo hire, unloading, material shifting |
| Approvals and fees | Fees paid for permissions, only where your contract makes them your cost |
| Office and overheads | Phone, stationery, office rent, accounting help |
| Loan and interest | EMI for machines or vehicles, interest on any credit |
What goes on the income side?
- Running bill raised, with the date and the work period it covers.
- Amount received against each bill, with the date and mode.
- Retention or amounts held back by the client, tracked separately until they are released.
- Advances received before work begins, which are not the same as bills earned.
- Extra work or variations agreed in writing, noted against the right site.
What does a hypothetical month look like on one site?
Say one site raises a running bill of ₹4,50,000, and the client holds back ₹20,000 as retention. Costs for the month are materials ₹1,80,000, labour ₹1,20,000, sub-contractors ₹45,000, equipment ₹20,000, supervision ₹25,000, site overheads ₹10,000 and transport ₹12,000.
| Line | Amount (₹) |
|---|---|
| Running bill raised | 4,50,000 |
| Total costs | 4,12,000 |
| Margin on paper | 38,000 |
| Retention held by client | 20,000 |
| Cash received | 4,30,000 |
| Cash left after costs | 18,000 |
The costs add up as 1,80,000 plus 1,20,000 plus 45,000 plus 20,000 plus 25,000 plus 10,000 plus 12,000, which is ₹4,12,000. The paper margin is 4,50,000 minus 4,12,000, or ₹38,000. Because ₹20,000 is held back, the money that actually arrived is ₹4,30,000, and the cash left is 4,30,000 minus 4,12,000, or ₹18,000. Both numbers matter, and the gap between them is what you are waiting to collect.
What gets missed on a building site?
- Weekly wage payments handed out in cash with no list of names and days.
- Material bought at a local shop for an emergency, paid from your pocket.
- Small hire charges for a pump or a cutter used for one day.
- Rework and breakage, which look like normal material cost but should be noted separately.
- Money advanced to a sub-contractor, which needs to be matched against the final settlement.
What routine keeps site accounts honest?
- Give every site a short name and write it beside every entry.
- Keep a wage sheet for each week with names, days and amounts, and file it with the cash paid.
- Each Saturday, enter the week's materials, labour and hire on the site sheet.
- At month end, compare what you billed with what the client has paid, and list the gap in a separate column.
Before starting a new site, copy the last site's cost sheet and compare it with your quotation line by line. Where past sites ran over on labour or transport, adjust the next quote. A contractor who tracks cost by site for a year has a better pricing guide than any rule of thumb.
Useful ideas start with a clearer picture of your own spending.
Explore your reports
