For any larger purchase, create one folder with three papers inside: the quotation you were given, the order you placed, and the final bill you received. When the bill differs from the quote, which it often does, the folder lets you explain exactly why instead of reconstructing it from memory a year later.
What does each paper prove?
| Paper | It proves | Typical mistake |
|---|---|---|
| Quotation | What the supplier offered, at what rate, valid till when | Not saving it because the order was placed on a call |
| Purchase order | What you agreed to buy and on what terms | Order given verbally with no written trace |
| Bill | What you were finally charged | Paid without comparing it to the quote |
| Change messages | Any addition or removal you agreed after the order | Left in a chat that is later deleted |
How do you set up the folder?
- Create one folder per purchase, named with the date, the supplier and the item, for example 2026-27 / 2026-11 / fitout-shop-interiors.
- Save the quotation as soon as you receive it, with the date in the file name.
- Save the order: a purchase order, an order message or a signed quotation. If you gave the order by phone, send a message confirming it so that something is written.
- Save every change request as a short note or message: what changed, who agreed and the price effect.
- Save the final bill, and put a one-line note at the top of the folder saying whether it matches the quote.
A worked example: an interior fitout
Say a cafe owner receives a quotation of ₹6,80,000 for the fitout of a small shop. After placing the order, two changes are agreed by message: an additional wall shelf for ₹30,000 and a change of ceiling lights costing ₹15,000 more. The final bill arrives for ₹7,25,000.
The check: 6,80,000 plus 30,000 plus 15,000 equals 7,25,000. The bill matches the quotation plus the two agreed changes, and the folder shows exactly where each rupee came from. Without the change messages, the extra ₹45,000 would look like an overcharge or an unexplained expense.
What if the bill does not match?
Do not pay the difference until you can say which side it comes from. Compare line by line, quantities and rates first, then unit changes. A difference might be an agreed change not yet recorded, a supplier mistake, or an extra charge such as transport or installation that the quote left out. Write the explanation next to the bill and ask the supplier to correct or confirm in writing.
What should a change message say?
Keep it short and complete: the order it changes, what is added or removed, the price effect in rupees, the new delivery date if it moves, and a reply from the supplier saying yes. A line such as: please add one wall shelf, 6 feet, for ₹30,000 extra, same delivery date, followed by their okay, is enough. Without the supplier's reply, you hold only your own request, not an agreement.
Which purchases need this much care?
Anything where a difference could be large enough to argue about: furniture, machinery, renovation, bulk stock, a vehicle, or a laptop order for staff. For ordinary small buys, the bill alone is enough. A rough threshold you set yourself, such as everything above ₹25,000, is easier to follow than judging each time.
Where do the payments fit?
Record the payments against the same folder: advances, part payments and the final one, each with its proof. When bank statements are imported into SpendixAI, you can attach the receipt or bill to the matching transaction so the payment and the paper sit together.
Closing check
- Quote, order and bill are in one folder.
- Every change has a written trace.
- The bill has been compared with the quote and any difference explained.
- Payments are listed against the same folder.