Snag list at possession: defects, fixes and who pays

A room-by-room snag list for flat possession with columns for photo, date reported, builder response and your own repair costs, so open items stay visible.

Editorial illustration for Snag list at possession: defects, fixes and who pays

A snag list is a dated record of every defect you find in a new flat before or just after you accept possession. Make it room by room, attach a photo to each item, write the date you reported it and what the builder said, and add a column for anything you end up fixing at your own cost. That last column is what turns a vague grievance into a number you can raise.

What should each snag entry contain?

  • Room and exact spot, for example 'bedroom 2, wall behind the door'.
  • What is wrong, in a line: crack, seepage patch, loose tile, switch not working, door not closing.
  • A photo or short video, taken before anyone touches it.
  • Date and how you reported it: email, builder's portal, handover form, message.
  • The builder's response and promised date.
  • Status: open, fixed by the builder, or fixed by you.
  • Cost if you paid for the fix, with the receipt.

How do I walk the flat without missing things?

Go room by room in the same order every time, and bring a torch, a phone charger to test sockets, a small spirit level if you have one, and a tape. Run every tap, flush every toilet, open and close every door and window, and switch on every light and fan. Tap tiles lightly and listen for a hollow sound.

AreaThings to test or look at
Living and bedroomsWall and ceiling cracks, paint finish, window latches, door alignment, switches and sockets, fan points
KitchenPlatform level, sink drainage, tap flow, tile joints, exhaust and gas point positions, socket count
BathroomsFlushing, water drainage slope, leaks around joints, hot water point, door and ventilation
Balcony and terraceFloor slope toward the drain, railing firmness, any damp stains on the ceiling below or the wall
Common to the flatMain door lock, intercom, meter box, any pending items listed in the agreement

Who pays for a defect?

That depends on what your agreement says and on how long the defect appears after possession. Read the clause that covers defects and the period for them, and note the clause number beside any item you raise. If you are unsure whether a particular item is covered, ask your lawyer rather than guess. Do not assume either way.

What if I fix something myself?

Sometimes waiting is not practical, for example a tap that leaks daily. If you pay for a fix yourself, tell the builder in writing first, keep the plumber's or electrician's bill, and record the cost against that snag line. Say a leaking tap costs ₹1,800 to fix and re-grouting tile joints costs ₹3,200, both made-up figures. Your 'paid by me' column then totals 1,800 + 3,200 = ₹5,000, a clear figure to put in front of the builder.

What should I do with the open items?

  1. Send the full list to the builder in one message, with photos, and ask for a written reply with dates.
  2. Keep sending reminders on a schedule, not ad hoc, and log each one.
  3. Mark an item closed only when you have checked it yourself.
  4. Keep one running total of money you spent on items the builder should have fixed.

Keeping the cost visible

Every repair you pay for should be saved as an expense with the receipt, so the figure is not buried in household spending. In SpendixAI you can add several expenses by hand at once and keep each receipt with its transaction, then filter by a tag or category to see only the snag fixes. Whether any of it is recoverable is a matter for your agreement and your lawyer.