Wardrobes and carpentry by the square foot: a measurement log

A carpentry cost per sq ft record: log each item's width, height, rate and finish when you order, then check the carpenter's final measurement bill line by line.

Editorial illustration for Wardrobes and carpentry by the square foot: a measurement log

When a carpenter charges by the square foot, the final bill depends on how every item is measured. Log each item's width, height, rate and finish at the time of order, and when the measurement bill arrives, compare it line by line with your log. Most disputes come from a few inches added at the edges.

What goes in the measurement log?

One row per item, filled in at the time of ordering and, ideally, initialled by the carpenter or confirmed on a message.

  • Item: wardrobe in the master bedroom, TV unit, shoe rack
  • Width and height in feet and inches, and the depth if it matters to the rate
  • Area in sq ft: width times height
  • Rate per sq ft, the material and the finish, such as laminate or veneer
  • Extras: loft, internal drawers, mirror, soft-close hardware, which may be priced separately
  • Agreed amount for the row

How do you work the amounts?

With width in column C, height in column D and rate in column F, the area is =C2*D2 and the amount is =C2*D2*F2, copied down. Convert inches to decimal feet first; 6 ft 3 in is 6.25 ft. Then total the amount column.

ItemWidth (ft)Height (ft)Area (sq ft)Rate (₹)Amount (₹)
Wardrobe, bedroom 167421,35056,700
TV unit52101,10011,000
Shoe rack341290010,800
Total--64-78,500

All figures are made-up. The areas add to 42, 10 and 12, which is 64 sq ft, and 56,700 plus 11,000 plus 10,800 equals ₹78,500.

How do you check the carpenter's bill?

When the measurement bill arrives, add its items to your sheet in a new column and subtract. Say the bill lists the wardrobe at 7.5 ft by 6 ft. That is 45 sq ft, and at ₹1,350 it comes to ₹60,750. Your log says 42 sq ft and ₹56,700, so the difference is ₹4,050. Ask where the extra half-foot came from: does it include the loft, the side panel or a rounded-up measurement?

What about the finish and fittings?

Laminate, veneer, paint and glass shutters carry different rates, and a sliding or hinged door may change the price. Record the finish and its rate per row. Hardware such as channels, handles and soft-close hinges is often billed separately by count, so give them their own rows, and compare the quantities with what is installed.

What if the final measurement is bigger than your log?

  1. Measure the finished item yourself with a tape, and photograph it with the tape visible.
  2. Compare it with the order log, row by row.
  3. Ask for the carpenter's working, not just the total.
  4. Agree a corrected figure in writing before the next payment.

How do you record the payments?

Enter each advance and balance as an expense on the actual date, in a category such as Home, with a note naming the item and the carpenter. In SpendixAI, you can keep the measurement bill or a photo of the signed order as the receipt on the payment. For cash payments, add them by hand so the totals stay right.

Keep the log in the same file as the payments, and the final check takes a few minutes. Add one more column for the date of each advance, so you can see at a glance that the amount paid so far never runs ahead of the work done.

A short checklist for the day the carpenter finishes

  • Every item in the order log is present, and no item appears on the bill that you did not order
  • Measurements on the bill match your tape within the rule you agreed
  • Doors open and close fully, drawers run smoothly, and shelves are level
  • Finish and colour match the sample you approved
  • The final payment is made only after these checks, and the receipt names the items it covers