Bathroom renovation checklist with cost lines and hidden extras

A bathroom renovation cost checklist: demolition, waterproofing, tiles, plumbing, fittings, debris removal, labour days and a contingency to price from your quotes.

Editorial illustration for Bathroom renovation checklist with cost lines and hidden extras

A bathroom renovation budget needs more lines than most people expect: demolition, waterproofing, plumbing, tiles and their fixing material, fittings, sanitaryware, electrical points, debris removal, labour days and a contingency. Ask each contractor to price these lines separately, add your own purchases, and set the cushion last. The hidden extras are the ones that appear only after the old tiles come off.

Which cost lines should the checklist have?

LineHow to price itYour quote (₹)
Demolition and hackingPer bathroom, or per day of labourFill in
WaterproofingPer square foot, with the number of coats and the product namedFill in
Plumbing, concealed linesPer point or per bathroom; ask if old pipes are being replacedFill in
Floor and wall tilesQuantity needed times your rate, plus the extra for cutsFill in
Adhesive, grout, spacersPer bag or per jobFill in
Fittings: taps, shower, mixerPer piece, by modelFill in
Sanitaryware: WC, basinPer piece, with installationFill in
Vanity, mirror, accessoriesPer pieceFill in
Electrical: geyser point, exhaust, lightsPer pointFill in
Door and frame, if replacedPer doorFill in
Debris removalPer trip or per jobFill in
Labour daysWorkers times days times daily rateFill in
Cleaning after workPer jobFill in

What hidden extras tend to appear?

  • Old pipes that crack or corrode once exposed, so a bigger plumbing job than quoted.
  • Hacking that goes deeper than expected, which adds days and debris.
  • A ponding test for the waterproofing, which can add waiting days before tiling starts.
  • A leak into the neighbour's ceiling below, which may mean repair costs and a long argument.
  • Society rules on working hours, debris disposal and lift use that cost extra time or money.
  • A tile shade mismatch or a damaged box that needs replacing.

None of these is certain. They are the reasons to hold a cushion.

How do you price labour days properly?

Ask the contractor for the number of workers and the number of days. Say the plan is two workers for nine days at ₹900 a day each; that is 2 × 9 × 900 = ₹16,200. If waterproofing needs three extra waiting days and the workers cannot be sent to another site, ask whether those days are charged. Write the answer next to the line. All numbers here are only an example.

How big should the contingency be?

There is no fixed correct number, so choose one you can live with. If your quotes total ₹1,85,000 and you add a cushion of 15 per cent, the cushion is 1,85,000 × 0.15 = ₹27,750 and the working budget is 1,85,000 + 27,750 = ₹2,12,750. A bathroom in an older building, with concealed pipes you have never seen, argues for a larger cushion than a bathroom in a new flat. If the cushion is not needed, you keep it.

How do you record spending as the work goes on?

Create a bathroom category with one sub-category for each line above. Enter every payment, and every purchase you make yourself, in the right line. In SpendixAI you can add several expenses at once by hand, attach each bill as a receipt, and then group a report by sub-category to compare the checklist estimate with actual spending. A manual column in a sheet works equally well; the point is one row per cost.

Before you start

  1. Get at least two quotes, with the same lines priced in each.
  2. Note what each quote excludes.
  3. Decide the cushion and write it beside the total.
  4. Agree on how extra work is approved, in writing.
  5. Keep a photo record of the old pipes and walls before they are covered.