To budget an electric car road trip, work out the kWh you will need, subtract what you start with from home, divide the rest into charging stops, and add the cost of waiting. With the made-up car and route below, a 600 km leg needs 3 public charging stops, costs about ₹1,200 in charging and adds about 2 hours of waiting.
How many kWh does the trip need?
Energy needed = distance x kWh per km. Say the car uses 15 kWh per 100 km, which is 0.15 kWh a km, and the leg is 600 km. Then 600 x 0.15 = 90 kWh. Use your own figure from the car's trip computer, and expect it to be worse at highway speeds, with luggage or in hot weather.
How do I split the energy into charging stops?
Say the battery is 40 kWh and you do not want to arrive below about 10 kWh. A full start from home covers roughly 30 kWh of use, so 200 km of the journey is already paid for at your home tariff. The remaining 400 km needs 400 x 0.15 = 60 kWh from public chargers.
If each stop adds around 24 kWh, for example by charging from 20 to 80 percent, then 60 / 24 = 2.5, which rounds up to 3 stops. Always round up, and plan a spare stop in case a charger is out of order.
| Item | Working | Sample result |
|---|---|---|
| Energy for 600 km | 600 x 0.15 | 90 kWh |
| Covered by home charging | 200 km x 0.15 | 30 kWh |
| Needed from public chargers | 90 - 30 | 60 kWh |
| Charging stops | 60 / 24, rounded up | 3 |
| Charging cost at ₹20 per kWh | 60 x ₹20 | ₹1,200 |
| Waiting time at 40 minutes a stop | 3 x 40 | 120 minutes |
| Snacks or a meal at each stop, ₹150 | 3 x ₹150 | ₹450 |
| Leg total, excluding home charging | ₹1,200 + ₹450 | ₹1,650 |
The ₹20 a kWh and the 40 minutes are placeholders. Charging prices and speeds depend on the charger and the car, so check the price shown at each stop, not an estimate.
What about the cost of time?
An extra 2 hours a leg is real. It may push you into an extra night or a restaurant meal you would not otherwise have had. If the waiting turns a 7-hour drive into a 9-hour one, think about whether you will arrive in daylight, and add the cost of any stay you now need. Put that in the budget as its own line.
What should I do about the return leg?
Count the return leg the same way, but check whether you can charge at the destination, for example at a hotel. If you can, the return may need fewer public stops. If you cannot, assume the same number as the outbound leg. Charging overnight at a place you are staying is slow but quiet, and it does not cost you waiting time.
How do I record a trip like this?
Charging payments usually arrive through an app or UPI and show up on your statement. Importing it into SpendixAI lets you check each row and sort it into a charging sub-category, with food and stays in their own. Because AI categorisation can be switched off or set to a monthly limit, you decide how much is automatic. The kWh and minutes you note yourself.
A planning checklist
- Get your real kWh per 100 km from recent drives.
- Mark charging points along the route and a backup for each.
- Add a spare stop.
- Budget the extra time and food at each stop.
- Keep the log from this trip for the next.
Useful ideas start with a clearer picture of your own spending.