Interior designers usually charge in one of three ways: a fixed fee for the job, a rate per square foot, or a percentage of the project cost. The first two are known in advance; the third grows with the spend. Whichever you choose, write the basis, the amount and the payment schedule in one line before work begins.
How does a fixed fee work?
You and the designer agree one amount for a defined scope, such as design, drawings and site supervision. It is simple to track, because the number does not move unless the scope does. The risk is vagueness: if the scope is not written down, extra visits or revisions become a dispute.
How does a per square foot fee work?
The fee is a rate multiplied by an area. Say the rate is ₹150 and the area is 1,000 square feet. The fee is ₹1,50,000. Ask which area is being used, whether carpet, built-up or another measure, and whether balconies and utility areas count. A different area changes the fee.
How does a percentage fee work?
The fee is a share of the total project cost. Say the project costs ₹12,00,000 and the agreed share is 10 percent. The fee is ₹1,20,000. If the project grows to ₹14,00,000, the fee grows to ₹1,40,000. Ask exactly what counts as project cost: furniture you buy yourself, items you source, and extras added midway.
| Structure | Basis | Example fee | Watch for |
|---|---|---|---|
| Fixed | One amount for a written scope | ₹1,25,000 | Scope creep and revision limits |
| Per sq ft | Rate times area | ₹1,50,000 on 1,000 sq ft at ₹150 | Which area is measured |
| Percentage | Share of project cost | ₹1,20,000 on ₹12,00,000 at 10 percent | What counts as cost, and whether it grows |
All three figures are hypothetical and are not typical prices. The point is that they are not comparable until you see what each includes.
What should the payment schedule look like?
Fees are usually paid in stages, such as on booking, after the design is approved and after the site work. Agree the stages and the share at each. Do not pay the final stage until the deliverables you were promised have arrived. Ask whether GST is included in the quoted fee or added on top, and have it written.
What line do I record?
One row per designer, set before work starts.
| Field | Example entry |
|---|---|
| Designer | Name and phone |
| Structure | Percentage |
| Basis | 10 percent of project cost, as defined in the agreement |
| Scope | Design, drawings, site visits twice a week |
| Stage payments | Booking, design approval, handover |
| GST | Included or extra, as written |
Where do the payments go?
Pay by traceable modes, record each stage in your project sheet, and keep the agreement with the receipts. SpendixAI can hold each payment with its receipt under a category for the project, so the total fee paid is easy to read at the end.
Which structure suits which project?
A fixed fee suits a clear, bounded job where you know the scope. A per square foot rate suits a whole-home project where area is the main driver. A percentage suits a project where the designer sources and supervises most of the spending, though it can reward a bigger budget. None of these is the right answer for everyone, so ask the designer why they prefer theirs and compare.
Whichever you choose, ask for a short list of what happens if the scope changes: who decides, how a revision is priced and whether the fee moves.
How do I compare two designers fairly?
Ask each for the same things: a fee structure, what is included and what is not, how many revisions you get and how site visits are counted. Convert both to a rupee amount for your project. A lower rate with fewer visits and more extras may cost more than a higher rate that includes everything, so compare totals for the same scope, not rates.
Before you sign
- Ask for the structure in writing.
- Check the scope list.
- Confirm the area or cost definition.
- Agree the stages.
- Ask about GST.