A modular kitchen quote is easier to control when you break it into lines: carcass, shutters, hardware, countertop, backsplash, sink and taps, chimney, hob, plumbing and electrical work, and installation. Write each as its own row with the amount quoted, and keep a second list for anything added after signing. At handover, compare the final total with the quote line by line.
Which line items belong on the list?
| Line item | What to confirm before you pay | Often added after the quote |
|---|---|---|
| Carcass (the boxes) | Material and thickness named in the quote | Extra tall unit, extra drawers |
| Shutters | Finish and type, with sample seen | Upgrade to a different finish |
| Hardware | Hinges, channels, soft-close, basket and drawer fittings, by brand and model | Pull-out baskets, corner units |
| Countertop | Material, thickness, edge finish, cut-outs for sink and hob | Extra cut-outs, joint treatment |
| Backsplash | Whether the quote includes the wall tile and its labour | Extra tile and fitting |
| Sink and taps | Included or supplied by you | Different sink, filter point |
| Chimney and hob | Who supplies, who installs, duct route | Longer duct, wall cutting |
| Plumbing and electrical | Points shifted or added, and who pays for the wall work | Extra sockets, concealed wiring |
| Civil work | Removing the old counter, patching walls and floor | Re-tiling after removal |
| Transport and installation | Included or separate, and the number of days | Lift charges, extra visits |
What is the usual route from quote to handover?
- Site measurement by the vendor, followed by a drawing.
- You sign off the drawing and the quote. Fix the line items now.
- An advance is paid and the order is placed for the components.
- Civil, plumbing and electrical changes happen at the site.
- Carcasses and shutters are made and delivered.
- Installation, then countertop and appliances.
- Snag list, final payment, and handover.
The order and the number of weeks differ by vendor; ask for a written timeline and note it in your tracker.
How do you track what gets added later?
Keep an 'extras' list below the quote. Every addition gets a date, what was added, the quoted amount, and a note on whether you approved it in writing. Say the quote is ₹3,20,000 and three additions come along.
- Pull-out basket: ₹18,000
- Extra socket points: ₹9,500
- Wall tile for the backsplash: ₹6,000
Total: 3,20,000 + 18,000 + 9,500 + 6,000 = ₹3,53,500. The additions come to ₹33,500, a bit more than a tenth of the original. They are individually small, which is exactly how a total moves without anyone noticing. All figures are only an example.
How should you record the payments?
Log each payment against its stage: advance, order of components, delivery, installation, final. Keep the vendor's receipt with it. Use one kitchen category with sub-categories for the items you bought directly, such as the chimney, so it shows plainly what you paid the vendor and what you paid elsewhere. In SpendixAI the receipt can be attached to the matching transaction.
Which payments should be tied to which stage?
Ask the vendor to tie each instalment to a visible stage: drawing sign-off, order placed, delivery at site, installation complete, snag list closed. Record the percentage and the amount for each stage next to the line items. If the vendor asks for a large advance before the drawing is final, ask what happens to that money if the design changes. Keep the receipt for each payment, with the stage written on it.
What do you check at handover?
- Every line on the quote matches what is fitted.
- Warranty papers for hardware, chimney and hob are in your folder.
- Your extras list totals the same as the final bill difference.
- The vendor's contact for repairs and the process to follow are written down.