A modular kitchen project tracker is one table with a row for every component, columns for the quoted amount, what you have paid, delivery and installation dates and defects, and a running balance at the bottom. It keeps you from paying twice, missing a delivery or losing track of what the contractor still owes.
Which rows should the tracker have?
Use the contractor's own quotation as the list, and split it so each item can be tracked separately.
- Cabinets and shutters, with finish and hardware
- Counter top, including cutouts for the sink and hob
- Hob
- Chimney
- Sink and tap, if supplied by the contractor
- Installation labour, electrical and plumbing points
- Extras: lighting, backsplash tiles, accessories and soft-close fittings
If you buy the hob or chimney yourself, keep the rows anyway with a note that says 'bought by owner' and the bill number.
What does a filled tracker look like?
| Component | Quoted (₹) | Delivered on | Installed on | Defects noted | Fixed on |
|---|---|---|---|---|---|
| Cabinets and shutters | 1,60,000 | Not yet | Not yet | None | None |
| Counter top | 45,000 | Not yet | Not yet | None | None |
| Hob | 12,000 | Not yet | Not yet | None | None |
| Chimney | 14,000 | Not yet | Not yet | None | None |
| Installation and hardware | 25,000 | Not applicable | Not yet | None | None |
| Total quoted | 2,56,000 | Sum of rows | Sum of rows | Count of rows | Count of rows |
These amounts are hypothetical. Add 1,60,000, 45,000, 12,000, 14,000 and 25,000 and you get ₹2,56,000, which should match the quotation total. If your sheet total and the printed total differ, find out why before you pay anything.
How do you track payments and the balance?
Add a second small table for payments: date, purpose, amount, mode and reference. Say the schedule is ₹1,00,000 as advance on order, ₹1,00,000 on delivery and ₹56,000 on completion. That is 1,00,000 plus 1,00,000 plus 56,000, which equals ₹2,56,000. After the advance, the balance is 2,56,000 minus 1,00,000, which is ₹1,56,000. After delivery, it is ₹56,000. In a sheet, with the total quote in B1 and payments in column C from row 5 to row 10, the balance is =$B$1-SUM($C$5:$C$10).
What should you check on delivery day?
- Count the boxes against the packing list or the quotation.
- Open and look at shutters and the counter for chips and scratches before the delivery person leaves, and note them on the delivery slip.
- Check model numbers on the hob and chimney against the quote.
- Take dated photos and enter the delivery date in the tracker.
What about installation and defects?
Note the installation date and then use the following week to open every drawer and door, run the tap and test the hob and chimney. Each problem gets a row with a date and a photo. When it is fixed, enter the fix date. A defect with no fix date is an open question you can raise before the last payment.
Where does the app help?
If advances go out by UPI or bank transfer, SpendixAI can read them from an uploaded statement, and you can attach the quotation or receipt to each payment. Cash payments to a carpenter or electrician can be entered by hand. The component tracker itself stays in your sheet, because it holds dates and defects rather than transactions.
Before you sign off
- Sheet total matches the quotation
- All payments have a date, mode and reference
- Every defect has a fix date or an open note
- Warranty papers filed for the hob and chimney