Business

Overhead per working hour: the floor under any quote

Some costs belong to no single job but must be paid by all of them. Dividing them by working hours gives the minimum each hour has to earn.

Editorial illustration for Overhead per working hour: the floor under any quote

Costs that no project owns

Rent, internet, software, insurance, accountant fees, equipment replacement and the owner’s own basic needs are all costs that exist whether or not any particular project is running. They are overhead. If they are not covered by the price of the work, the business loses money no matter how many clients it has.

The simplest way to cover overhead is to translate it into a cost per working hour.

Step one: total the yearly overhead

List every cost that is not tied to a single project, and add up a full year. Use real payments from the records where possible and include the occasional ones such as annual renewals and replacement equipment spread over its life.

Suppose the total is 240,000 units for the year.

Step two: count the hours that can be billed

Not every working hour is billable. Hours go to admin, marketing, learning, waiting and illness. Estimate honestly how many hours in a year are likely to be spent on paid work. Many solo workers find that the billable share is only half to two-thirds of the hours they are “at work”.

If 1,000 hours a year are billable, the overhead per billable hour is 240.

Step three: add the owner’s pay

The floor under a quote is overhead plus the income needed for the owner. If the owner needs 360,000 a year to live on, add it. The total to cover is 600,000, and divided by 1,000 billable hours, that is 600 per hour.

ItemYearly amount
------
Overhead240,000
Owner’s required income360,000
Total to cover600,000
Billable hours1,000
Minimum rate per hour600

Any quote below 600 an hour, after counting direct costs separately, is a quote that fails to pay the owner and the overhead together.

Direct costs sit on top

The floor does not include project-specific costs such as materials or subcontractors. These are added separately, so a project priced at 20 hours at 600 plus 5,000 of direct costs gives a floor of 17,000. This avoids the common error of folding overhead into direct costs or ignoring one of them.

Use it as a boundary, not a price

The floor is the lowest rate that keeps the business whole. Actual prices should usually be higher, based on the value of the work, the market and the client. But knowing the floor makes it easy to say no to work below it, or at least to know what is being given up when accepting it.

In SpendixAI, a category for overhead items and a yearly report make the first step quick. The rest is arithmetic that takes a quarter of an hour, and the answer is one of the more useful numbers a one-person business can know.

Treating the first estimate as a draft

The first overhead figure will be rough, and that is acceptable. Missing items are common: a licence renewed once a year, a repair, a software tool on a personal card. Over the first year, add each overlooked cost as it appears, and note the date so the history is clear.

By the second year, the overhead number is far better, and the hourly floor reflects reality more closely. Comparing the two years also shows whether overhead has grown faster than billable hours, a signal that either costs need trimming or rates need to rise.

Checking the number against reality

Test the floor against the last few quotes. If many were won at rates below it, the business either has unusually low overhead in practice or is quietly subsidising work. If most were above it, the margin for choice is wide. A floor calculation is not a verdict on any one quote but a reference that makes it easier to see which work is healthy and which is a gamble.

SPENDIXAI JOURNAL

Useful ideas start with a clearer picture of your own spending.

Explore your reports