Workshop utilities: separating machine hours from the lights

A workshop’s power bill hides what each machine really costs to run. A rough usage-based split turns one confusing number into pricing information.

Editorial illustration for Workshop utilities: separating machine hours from the lights

One bill, many users

A single electricity meter feeds lights, fans, a compressor, a grinder and perhaps a kettle. The bill at month-end offers one number, and it is tempting to spread it evenly across everything the workshop makes. But a job that runs a heavy machine for four hours uses far more power than one that runs a hand tool for twenty minutes.

Without a split, pricing treats both jobs the same way, and the heavy-machine work is quietly undercharged.

Finding the big consumers

Start with a list of equipment and look up the power rating on each nameplate, usually in watts or kilowatts. Then estimate typical running hours per month. Multiply the two, and the result is a rough monthly share in units of energy.

This does not require a meter on every machine. The aim is to see which two or three items account for most of the bill, because those are where decisions matter.

A rough allocation

Suppose the monthly electricity bill is 6,000. Rough estimates give the largest machine around 45 percent of the use, a second machine around 25 percent, and lighting, fans and small tools the remaining 30 percent. The allocation is then 2,700, 1,500 and 1,800.

If the large machine runs on about 60 hours of paid work a month, each hour carries 45 units of power cost. That number can be added to the price of any job needing that machine.

Using it in quotes

Once a cost per machine hour exists, a quote can include it directly alongside materials and labour. This is more accurate than adding a flat percentage for utilities. It also makes it easier to explain a price to a customer who asks why a particular job costs more.

Seasonal swings and standing charges

Power use often rises in hot months or busy seasons. Look at a year of bills before settling on averages. Also separate out fixed charges that arrive regardless of use, since these belong to the overhead of simply having a connection, not to any particular machine.

Where possible, check whether the meter serves only the workshop. A shared meter with a home or neighbour is a reason to agree a written split with whoever shares it.

Cutting cost where it counts

Knowing the split points to action. A machine left idling, a poorly sized motor or a lighting setup that burns all day are obvious targets. Even a modest saving of 10 percent on the biggest consumer is more useful than trimming the smallest item to nothing.

Run the machines in batches where possible, so that heavy equipment is switched on once, not several times in the same day. Notice also whether peak-time charges apply and whether any work can move outside those hours, within what the local tariff allows.

Where the split goes in the books

Enter the bill under a utilities category and add the split in a note, or record it as separate lines per machine group if finer detail is wanted. In SpendixAI, a monthly report by category shows whether the utilities line moves with workload, which is a useful check on whether the allocation still reflects reality.

A simple sanity check on the result

After building the split, add the allocated amounts and confirm that they equal the bill. Then compare the implied cost per machine hour against actual job prices. If a job uses an hour of the large machine and sells for less than the power, labour and materials combined, the pricing needs attention, not the allocation.

Revisit the figures when a machine is replaced, since newer equipment often draws less power for the same work, and the allocation can shift considerably after an upgrade.